Protocol Initialized

Transmission Received. Blueene HQ will contact you shortly.

VEHICLE SUPPRESSION

Segment View

Automotive Thermal Management

Precision suppression for manifolds and fuel lines. Calibrated to 120°C trigger protocols.

Calibrated 120°C Trigger Point
Non-Corrosive Clean Agent
Manifold & Fuel Line Focus
SYSTEM MONITOR Armed
25°C
Solid

AR-TUBE LIVE ACTION DEMONSTRATION

THE SCIENCE OF AR-TUBES

01

Polymer Sensing Tube

Specialized polymer sensor tube designed with micro-thickness variance to act as a linear heat detector.

02

Thermal Activation

Fire triggers the tube precisely at the source ($80^{\circ}C$ - $120^{\circ}C$), creating an instant localized nozzle.

03

Automatic Suppression

Agent deploys within seconds smothers fire instantly without residue.

Non-Conductive

"The agent does not damage electrical boards and is not a conductor of electricity."

3-5 Year Service

Zero maintenance requirements during operational life.

Interactive 3D Blueprint

THE INLINE BLUEPRINT

Precision-engineered steel pressure meter designed to be the exact same diameter (1:1 ratio) as the polymer tube.

THE PHYSICS OF SAFETY

01 — Detection

Linear sensing via multi-layer polymer tube pressurized at 20 Bar.

02 — Degradation

Polymer glass transition creates a localized rupture nozzle precisely at heat source.

03 — Thermodynamics

Liquid-to-gas endothermic phase change floods fire instantly.

GLOBAL AUTHORITY & COMPLIANCE

CE 1128

EU Safety

ISO 9001

Quality System

NABL

Lab Tested

NABCB

Accredited

NTH

Govt House

Eco Friendly

Inspection

  • ● AGSI Global Inspection Certified
  • ● QSI (Quality Systems International)
  • ● UASL Laboratory Verified
  • ● Globe Mark Quality Certification
  • ● Quality Control Approved (QCA)

Safety Standards

  • ● ISO 14001:2015 Environmental System
  • ● OHSAS 18001:2007 Safety Management
  • ● ISO 9001:2008 Legacy Compliance
  • ● CIHT Technical Recognition

Operational

  • ● GeM Registered provider
  • ● MSME Registered Business
  • ● Make In India Initiative

INSTALLATION PROTOCOL

PHASE 01: ANALYZE

  • 1. Risk ID: Map potential ignition sources.
  • 2. Volume: Calculate enclosure dimensions.
  • 3. Heat Zones: Identify hazard centers.

PHASE 02: MOUNT

  • 4. Routing: Install 15-20cm above source.
  • 5. Secure: Use ties every 20-30cm (do not pinch).
  • 6. Seal Caps: Mount caps using steel brackets.

PHASE 03: ACTIVATE

  • 7. Sensors: Connect optional switches.
  • 8. Monitor: Gauge must be in Green (20 Bar).
  • 9. Inspection: Weekly verification of visibility.

MATERIAL SAFETY DATA SHEET

HFC-227EA

SECTION 1: PRODUCT

Name: Heptafluoropropane | Trade: Blueene Clean Agent.

SECTION 2: HAZARDS

Non-flammable gas. Pressure risk. Frostbite risk.

SECTION 3: FIRST AID

Inhalation: Move to fresh air. Skin: Wash with warm water.

CONFIGURATION MATRIX

0.00 m³
LengthGas (kg)CoverageINR (₹)

REQUEST FOR QUOTE